SECRETARY OF LABOR v TWENTYMILE COAL COMPANY |
SECRETARY OF LABOR v TWENTYMILE COAL COMPANY |

Jun 10, 2005· A chute was designed to facilitate the process The 45-to-50-foot chute, five feet square, was placed in a vertical shaft twelve feet in diameter The rock-coal mix was dumped into the chute from a conveyer belt, where it fell from one level of the mine to the level below Id at 667...

Know More
December 28, 2004 - Mine Safety and Health Administration
December 28, 2004 - Mine Safety and Health Administration

Order No 7547301 was issued on December 28, 2004, under the provisions of section 103(k) of the Mine Act The preparation plant has experienced a non-fatal injury accident which has the potential to result in death The accident and injury occurred in the area of the No 102 belt head chute, which was located on the top floor of the sampling ....

Know More
SAMPLE SAFE WORK PROCEDURES (TEMPLATES)
SAMPLE SAFE WORK PROCEDURES (TEMPLATES)

- Sample Safe Work Procedure Templates These templates may be used to develop task specific safe work procedures for the circumstances involved SAMPLE SAFE WORK PROCEDURES (TEMPLATES) The Safe Work Procedures (Templates) presented herein are a sample guide to the subject matters and should not be considered as a legal authority...

Know More
Silo Cleaning, Build-up and Blockage Clearing, Rock ,
Silo Cleaning, Build-up and Blockage Clearing, Rock ,

The Cardox System is both versatile and safe for silo cleaning, clearing of build-up, blockages and rock excavation It has been proven to many as the most EFFICIENT, RELIABLE and COST EFFECTIVE method used today The SiloWhip System is the MOST POWERFUL silo whip in the world Although it is purposely build to take on the hardened build-up commonly found in cement and clinker silos, it is ....

Know More
Secretary of Labor, Mine Safety and Health Administration ,
Secretary of Labor, Mine Safety and Health Administration ,

Secretary of Labor, Mine Safety and Health Administration, Petitioner/cross-respondent, v Twentymile Coal Company and Federal Mine Safety and Health Review Commission, Respondent/cross-petitioner, 411 F3d 256 (DC Cir 2005) case opinion from the US ,...

Know More
Conveyor Safety Guide - maqohscsagovau
Conveyor Safety Guide - maqohscsagovau

Conveyor Safety Guide Promoting Work Health and Safety in the Workplace , SAFE WORK PRACTICES 22 151 General 22 152 Information to be supplied and maintained 22 , Solid particulate materials, such as ores, coal, grains, wood-chips, sand, gravel and stone in bulk form It also applies to the handling of mixed wastes...

Know More
SAFE WORK PROCEDURES CHIPPER - Bendigo Hire
SAFE WORK PROCEDURES CHIPPER - Bendigo Hire

SAFE WORK PROCEDURES CHIPPER Sequence Identified hazards Key processes to be followed Precautions / PPE required 5 Operation (feeding) Moving objects Feed material into machine from side position away from the front of the in-feed chute, and move away from feed line ,...

Know More
Coal Chute Vibrator | Products & Suppliers | Engineering360
Coal Chute Vibrator | Products & Suppliers | Engineering360

Find Coal Chute Vibrator related suppliers, manufacturers, products and specifications on GlobalSpec - a trusted source of Coal Chute Vibrator information , Safe coal handling practices are designed to ensure that the fuel remains intact throughout its journey from the mine until the point at which it is ignited in the boiler It takes as ....

Know More
United States Court of Appeals
United States Court of Appeals

United States Court of Appeals FOR THE DISTRICT OF COLUMBIA CIRCUIT Argued May 16, 2005 Decided June 10, 2005 Nos 04-1292 & 04-1312 SECRETARY OF LABOR, MINE SAFETY AND HEALTH ADMINISTRATION PETITIONER/CROSS-RESPONDENT v TWENTYMILE COAL COMPANY AND FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION, RESPONDENT/CROSS ,...

Know More
Municipal Utility Worker Falls While Clearing a Clog in a ,
Municipal Utility Worker Falls While Clearing a Clog in a ,

Municipal Utility Worker Falls While Clearing a Clog in a Conveyor Chute On December 24, 1999, a 39-year-old municipal utility worker was killed when he fell from a hopper while trying to unclog a sludge conveyor chute The incident occurred in the dryer area of a sewage treatment plant where sewage sludge is dried to a powder...

Know More
CONVEYOR BELTS SAFETY PROCEUDRE - tatapower
CONVEYOR BELTS SAFETY PROCEUDRE - tatapower

Work area: A place at a work site where a worker is, or may be, present during work or during a work break Job Safety Analysis (JSA): Job safety analysis is a procedure which helps integrate accepted safety and health principles and practices into a particular task or job In a JSA, for each basic step of the job, it is to identify potential...

Know More
Procedure for Form work, Steel bar fixing, Concreting and ,
Procedure for Form work, Steel bar fixing, Concreting and ,

Sep 05, 2011· Procedure for Form work, Steel bar fixing, Concreting and Cube testing 10 , Concrete surfaces in direct contact with earth shall be coated with 2 coats of coal tar 64 Rebar Fixing , Supervisor shall ensure that all necessary health and safety procedures during the field survey, Site preparation, Setting out and excavation work ....

Know More
Safety Operating Procedures - Chipper/shredder
Safety Operating Procedures - Chipper/shredder

Ensure the chipper chute, feed intake, and cutting chamber are empty and free of all debris OPERATIONAL SAFETY CHECKS Know how to stop the machine and disengage it quickly Keep bystanders well clear from the machine while it is operating If you need to push material through the shredder hopper, use a small diameter stick...

Know More
BACKHOE AND HYDRAULIC EXCAVATOR OPERATION
BACKHOE AND HYDRAULIC EXCAVATOR OPERATION

recommended safe job procedures for backhoe and hydraulic excavator operation Backhoes are used at surface metal and nonmetal mines for various types of applications Their versatiity makes these machines widely used pieces of mobile equipment Backhoes were designed basically for ditching and cleanup Their use has been...

Know More
Fatality Alert - Mine Safety and Health Administration (MSHA)
Fatality Alert - Mine Safety and Health Administration (MSHA)

METAL/NONMETAL MINE FATALITY – On August 9, 2016, a 33 year old Leadman Contractor, with 4 years of experience, was killed at a cement plant loadout The victim was attempting to replace the lift cable pulleys on the barge loadout chute, when the anchor point for the temporary rigging separated from the loadout chute and it unexpectedly fell...

Know More
SAFE WORK PROCEDURE Job/Task: Date Prepared : ,
SAFE WORK PROCEDURE Job/Task: Date Prepared : ,

unclogging a discharge chute or crossing a gravel area Use a stick, not your hands, to clear a clogged discharge chute 10 Turn off the mower blades (or motor if blades cannot be separately turned off) if a person enters the mowing area or a , END OF SAFE WORK PROCEDURE Title: MAST...

Know More
Sawmill Worker Killed By Chipper - facepublic-health ,
Sawmill Worker Killed By Chipper - facepublic-health ,

Employers should ensure that a job safety analysis has been performed on all work-related tasks Discussion: Job safety analysis (JSA) is a procedure used to review methods or steps for a particular task in order to identify potential hazards Employees are encouraged to participate in job safety analysis...

Know More
Fatality Alert - Mine Safety and Health Administration (MSHA)
Fatality Alert - Mine Safety and Health Administration (MSHA)

Establish safe work procedures before conducting specific tasks on belt conveyors and ensure that the safe work procedures are followed Train persons to recognize the hazards of working near belt conveyors Deenergize and block belt conveyors against motion before working near a chute, drive, head, tail, and take-up pulleys...

Know More
GUIDELINE - Aspasa
GUIDELINE - Aspasa

these safe working procedur All new staff, whether temporary or permanent, must be formally instructed in the safe work procedures for a particular task, and records of training must be maintained Regular training of the work force is a priority 35 Safe Operating Procedures...

Know More
Waste Chute Training and Operation Manual - Hickory Group
Waste Chute Training and Operation Manual - Hickory Group

Chute Systems Training and Operation Manual Page 6 2 Operation and Safety 21 Safe Operating Procedure Before You Start • Ensure all operators are trained in the safe ,...

Know More
SAFE WORK PROCEDURE Snow Blower - pembinatrailsca
SAFE WORK PROCEDURE Snow Blower - pembinatrailsca

SAFE WORK PROCEDURE Snow Blower Page 3 of 3 REGULATORY REQUIREMENTS WS&H Act W210, Section 4, 5, 7, 71 Regulations 217/2006, o Part 2, Section 21 Safe Work Procedures o Part 6, Section 61 PPE o Part 8, Musculoskeletal Injuries o Part 12, Section 123, Hearing Protection...

Know More
TWENTYMILE COAL COMPANY -- August 12, 2004
TWENTYMILE COAL COMPANY -- August 12, 2004

Aug 12, 2004· These persons entered the area to work at unplugging the chute before they had received safety training Order 7618153 The order was abated when Twentymile adopted procedures for working around the rock chute, including instructing miners in safe work practic Tr 44-45; Gov't Ex 4 Twentymile filed a notice of contest...

Know More
Secretary Of Labor v Twentymile Coal Company - Judicial View
Secretary Of Labor v Twentymile Coal Company - Judicial View

This case comes before us on cross-petitions for review of an order of the Federal Mine Safety and Health Review Commission wherein the Commission ruled that Twentymile Coal Co ("Twentymile") violated the mandatory training standard set forth at 30 CFR § 487(c) (2002), but that the proposed penalty assessment was not issued within a reasonable time...

Know More
Mining Safety Process Using The Easychute - Easy Chute ,
Mining Safety Process Using The Easychute - Easy Chute ,

Jun 10, 2019· Recent Blogs Mining Safety Process Using The Easychute 10 June 2019 3 Ways the EasyChute has been utilized in the Mining industry 1 Efficiency The EasyChute has streamlined work processes delivering both cost and operating efficiencies and creating safer and profitable working environments in Mining sites across Western Australia, Victoria, Queensland & New South Wal...

Know More
411 F3d 256 Secretary of Labor v Twentymile Coal Company ,
411 F3d 256 Secretary of Labor v Twentymile Coal Company ,

May 16, 2005· A chute was designed to facilitate the process The 45-to-50-foot chute, five feet square, was placed in a vertical shaft twelve feet in diameter The rock-coal mix was dumped into the chute from a conveyer belt, where it fell from one level of the mine to the level below Id at 667 The chunks falling through the chute ranged in diameter from ....